Premier Tech launch the next generation of Rewatec compact and vertical pump stations

Premier Tech Water and Environment has announced the launch of its Rewatec range of compact and vertical pump stations.

Building on over 50 years’ of experience in the design, development and manufacture of innovative water and wastewater treatment systems, Premier Tech has redesigned its range of compact and vertical pump stations to provide a reliable and efficient solution for raising sewage, effluent, wastewater and surface water in areas where a gravity discharge is unavailable.

Premier tech RCPS1350

By consolidating the design methodology and relevant componentry of the existing range where appropriate, and by analysing the operational effectiveness of each tank, Premier Tech has streamlined its manufacturing and ordering process to significantly reduce lead times across the new range, resulting in a much quicker delivery time for all its customers across the UK.

 

Premier tech RCPS900

 

In addition to increased efficiency, the performance of the new compact and vertical pump stations has also been elevated, providing robust, easy to install and long-lasting solutions for total peace of mind.

Designed for smaller residential developments, the compact range of pump stations are available in 900mm diameters and are suitable for properties of up to 9 people (PE). For larger residential developments or small commercial projects, the vertical range of pump stations are available in 1,200mm and 1,500mm diameters and are suitable for properties of up to 18 people (1,200mm) or 35 people (1,500mm). A full range of options and accessories – from high level alarms to control panels and kiosks, are also available to fully satisfy customer needs.

As part of the new range, a single pump is provided with every pump station as standard. Dual pump options are available for both compact and vertical pump stations upon request.

The Premier Tech commercial range of vertical and horizontal pump stations continue to be available. If a pump station with alternative arrangements and diameters is required, the Premier Tech team of in-house engineers can design and manufacture a bespoke solution to meet customer requirements.

 

NEWS CATEGORIES

LATEST NEWS

Thames Water appoints Julian Gething in newly created role as Chief Restructuring Officer

Thames Water has appointed Julian Gething in a newly created role as Chief Restructuring Officer to provide specialist advice as it continues its complex...

Vicky Gray joins Bruton Knowles as Associate, strengthening CPO expertise in the East of England

Bruton Knowles has announced the appointment of Vicky Gray as an Associate who will be based from its Bury St. Edmunds hub. Vicky joins...

Star-shape blade design ready to macerate solids at wastewater and biogas plants

Borger has launched a new cutting-basket macerator that helps protect wastewater/biogas pumps and downstream equipment by consistently mashing solids. Designed with pivoted cutting blades that...

First Business Water rebrands to Pozitive Water

First Business Water has rebranded as Pozitive Water Limited, following its 2023 acquisition by PE - the largest independent B2B energy supplier in the...