Barhale wins critical Lincolnshire drainage work

South Holland Internal Drainage Board (IDB) has awarded Barhale a contract to install, reinforce and renovate vital drainage works in Lincolnshire.

The infrastructure and civil engineering specialist will renovate the inlet, outfall and surge chamber at Dawsmere Pumping Station, a crucial part of the network of flood defences in and around Holbeach.

Dawsmere Pumping Station removes the sea water collected by the network of local drains and is essential for the protection of the surrounding land and villages which typically lie one metre below high sea level.

An unusual additional operational consideration is that, because the pumping station is located next to RAF Holbeach, the site must undergo “sweep and watch” protocols for unexploded ordnance before and during excavation work.

Keven Stobbs, general manager at Barhale, described the pumping station at Dawsmere as in the front line of defence for the land behind the seawall.

“South Lincolnshire, and specifically the South Holland area, is among some of the lowest-lying inhabited land in the UK,“ he said. “The system of drainage has been successfully developed and managed over centuries but we are more regularly facing extreme weather conditions so the process of maintenance and upgrade is hugely important.

“When carrying out work, we don’t like to take any component out of the system for too long so have been introducing innovative approaches to accelerate delivery. At Dawsmere, we will use a dam formed from one tonne bagged aggregate which can be deployed and removed very quickly.

Barhale regional director James Haddon sees the company’s selection for the South Holland IDB contract as a testament to the company’s expertise and experience across the water sector.

“South Holland IDB is engaged in a long-term project to enhance the resilience of this important agricultural area and we are delighted to have been selected to work with them to deliver their programme.”

SourceBarhale

NEWS CATEGORIES

LATEST NEWS

EFRA Committee Chair concerned about Thames Water bosses commitment to transparency and accountability after evidence session

Following this morning's evidence session with Thames Water bosses, Alistair Carmichael has expressed concern about the company’s commitment to transparency and accountability to its...

Dame Glenys Stacey to step down as Chair of the OEP

Dame Glenys Stacey has announced that she will not be seeking reappointment as Chair of the Office for Environmental Protection when her term ends...

Water professionals encouraged “to be the agents for change” at British Water’s 2025 Spring Reception

Water sector professionals need to use their expertise “to be the agents for change”. That was the message coming from a keynote delivered by...

New report lifts lid on workplace culture in the utilities sector

A new research based report launched in May reveals a complex picture of the current state of leadership and culture in the utilities...