Wetland planned for South Elmsall Wastewater Treatment Works

Yorkshire Water is planning to build an integrated wetland at its South Elmsall wastewater treatment works to help reduce storm overflow discharges into Frickley Beck – a tributary of the river Don.

The wetland is a nature-based solution designed to treat storm flows during heavy and prolonged rainfall.

An area approximately the size of 30,000m2 featuring interconnected ponds will be constructed and planted with over 220,000 plants, which will treat the storm water as it travels through the wetland via gravity.

Pollutants and nutrients, such as Phosphorus, will be naturally broken down and taken up by the plants and bacteria within the wetland. The wastewater will not include solid waste.

The new integrated constructed wetland will accommodate a flow of 440 l/s of diluted wastewater from heavy or prolonged rainfall events and will take approximately two years to construct by Eric Wright Water.

As well as providing a sustainable and energy-efficient way of treating the water, the wetland will also increase biodiversity in the area and attract a range of wildlife including bees and other pollinators, breeding birds, amphibians and reptiles.

Approximately 50 residents recently attended a drop-in session to hear about the plans for the site.

Simon Hudson, lead project manager at Yorkshire Water said:

“This is an exciting project and as we’ve seen with Yorkshire Water’s Clifton wastewater treatment works, these wetlands provide a range of benefits not only the way we treat wastewater, but also for the local environment.

“We want to naturally treat the storm water at South Elmsall, reducing the reliance of energy-heavy treatment processes, providing a sustainable way to remove pollutants and reducing storm overflows into the beck, while creating wildlife diversity and achieving a biodiversity net gain.

“The customers who attended the recent drop-in session were supportive of our plans and we look forward to delivering this project for the benefit of Yorkshire’s environment.”

NEWS CATEGORIES

LATEST NEWS

South East Water requests referral of its Final Determination to the CMA

South East Water has announced today (18 February 2025) that it has asked Ofwat to refer its PR24 Final Determination to the Competition and...

ECITB Census reveals water sector employers expecting above average workforce increases compared to wider engineering construction sectors

Figures published today (18 February) by the Engineering Construction Industry Training Board reveals that employers in the water sector are more optimistic than the...

Government says it welcomes the Office for Environmental Protection’s review of the implementation of current Bathing Water Regulations in England

The Government has said it welcomes the Office for Environmental Protection’s (OEP) review of the implementation of the current Bathing Water Regulations in England....

New Chief Executive Officer appointed at UK Water Industry Research

UK Water Industry Research (UKWIR) has appointed Mike Rose as its new Chief Executive Officer with immediate effect. With a career including senior positions in...