Barhale appointed to upgrade North London water artery

Thames Water has awarded civil engineering and infrastructure specialist Barhale a £16.8M contract to upgrade an important water trunk main running through the London Boroughs of Barnet and Enfield.

The work, which forms part of Thames Water’s AMP7 Conditional Allowance Trunk Main Schemes, will protect future water supply in the area.

Just over 2.3 kilometres of pipe will be replaced by Barhale along a new route running north west from Pert Close, Barnet to the southern end of Cannon Hill, Enfield.

Barhale will replace the existing 24” steel pipe with a combination of ductile iron or steel and high-density polyethylene pipe laid using open cut trenches and micro-tunnelling.

Shafts will be excavated either side of each tunnel section to serve as launch and reception chambers for the tunnelling works, which will make up 250 metres of the total length.

Shane Gorman, Barhale’s Water Director – Southern Region, said:

“Now is this right time to upgrade this aging main pipe. Installing a new trunk main will ensure this section of the water network is in optimum condition for the future.

“This is a significant mains upgrade programme in a busy part of London and we have worked closely with Thames Water to ensure that the design maximises value while minimising potential disruption.”

The works are expected to be completed by December 2024.

SourceBarhale

NEWS CATEGORIES

LATEST NEWS

Joint research on engagement and accountability published by CCW and Ofwat

Joint research by the Consumer Council for Water (CCW) and Ofwat, has been published, exploring the themes of consumer engagement with water companies and...

Prolonged dry conditions increase water scarcity across Scotland

The Scottish Environment Protection Agency (SEPA) has confirmed that Scotland’s water scarcity situation is worsening, with a further decline in river levels following another...

NRW steps up action in response to prolonged dry weather

Following the extended period of warm and dry weather, Natural Resources Wales (NRW) has confirmed that the trigger thresholds have been met to move...

£6m funding for automated drones and smart robotics that will be able to both sample and deliver near lab-grade analysis of coastal and inland...

A world-leading project that’s set to see drones, robots and a mobile lab transform how rivers and seas are monitored has been named a...